Apartments

Immerse yourself in a panoramic high life.

Construction is underway on Somerset East and West, the first two luxury residential towers at Burswood Point.

Designed by award-winning DKO Architecture, this curated collection of one-, two-, and three-bedroom residences and penthouses delivers an indulgent riverside lifestyle. With world-class architecture, exceptional amenities, direct foreshore access, and never-to-be-built-out views of the Swan River, Belmont Racecourse, and Perth Hills — Somerset sets a new benchmark for waterfront living in Perth.

Under Construction | Completion Q4 2027

Elevated Living by Design.

Each residence has been meticulously crafted to enrich every day. With expansive ceiling heights, refined materials, and seamless indoor-outdoor flow, the design draws inspiration from its natural surrounds to deliver comfort and sophistication.

Open-plan living areas and generous balconies take in panoramic views, while kitchens are appointed with island benches, sculleries, and premium Gaggenau appliances — making year-round entertaining effortless.

Schemes.

Interior colour palettes and material selections are artfully composed to complement and harmonise Somerset’s nature-inspired façade. Brought to life through simple warm colours that induce rest and repose after a busy day, the three distinctive finishing schemes reflect moments and moods savoured along the Swan River.

SPECIFICATIONS
  • COAST SCHEME

  • VALLEY SCHEME

  • CITY SCHEME

See the vision for yourself.

We invite you to book a private Virtual Reality walk-through of the stunning two and three-bedroom residences. Experience time slowing down as the living rooms and balconies respond in true spatial context to the visual drama of the winding riverscapes, exhilarating racecourse action and tree lined panoramas spread out before you.

BOOK YOUR VR TOUR

Our commitment to a sustainable future.

Golden Sedayu and DKO Architecture are setting a benchmark for sustainability, energy efficiency, and climate resistance for Somerset Residences.

  • 7 Star

    NATHERS RATING
  • 30%

    LESS ENERGY USE
  • 26%

    LESS WATER USAGE
  • 50kW

    SOLAR PEAK OUTPUT

Somerset Residences is Under Construction.

  • June 2025
    Construction Commences
    Construction begins, with site establishment, piling and excavation laying the groundwork for Somerset.
  • 2025
    Building Below
    Basements, foundations and essential infrastructure take shape beneath the future residences.
  • 2026
    Taking Form
    The structure begins to rise, with Somerset progressing into vertical construction. Floor by floor, the towers take shape as structural works progress above ground.
  • 2027
    Bringing it to Life
    Facades, glazing, services and refined interiors transform the structure into a finished residential destination.
  • Q4 2027
    Welcome home
    With construction complete and final details in place, Somerset is ready to welcome its first residents.

Latest News from Site.

  • 29 July 2026

    Construction Progress at Somerset | July 2026

  • 1 June 2026

    Construction Progress at Somerset | June 2026

  • 30 April 2026

    Construction Update at Burswood Point | April 2026

  • 4 February 2026

    2026 is starting strong

  • 10 December 2025

    Construction Update at Burswood Point | December 2025

  • 28 May 2025

    Piling rig latest construction update

Experience this incredible lifestyle for yourself.

Visit Display Suite

Register your interest

Register Now
Burswood Point

Latest News

Town of Victoria Park approve buildings three and four at Burswood Point.

Read More →